This guide walks you through the process of configuring trading paths for customer pairs, including quoting and trade paths, spread settings, provider prioritization, and operational controls.
1.1: Accessing the Table After Pair Creation
Once a pair is created, it automatically appears in the table.
Check the main columns:
Pair: Configured currencies (e.g., BRL/USDT)
Side: Buy, sell, or both
Quotation Strategy
Negotiation Strategy
Minimum / Maximum Value
Status: Active or inactive
1.2: Identifying the Actions Column
Locate the "Actions" column at the end of the table.
Note the available buttons for each pair.
2.1: Pair Status Control
The status button indicates whether the pair is active or inactive:
๐ต Blue: Pair is enabled
โช Gray: Pair is disabled
Click to toggle between active and inactive
2.2: Editing Pairs
Click the โ๏ธ pencil icon to edit the pair.
You can change any previous setting.
2.3: Accessing Path Configuration
Click the โ๏ธ gear icon.
A new component will open on the right with path options.
๐ This is one of the most detailed steps in the system.
3.1: Accessing the Paths Component
Click the โ๏ธ gear icon of the desired pair.
A side panel will appear with configuration fields.
3.2: Adding Trade Path
Top field: Click the Add Paths button.
Middle field: Displays the name of the pair.
3.3: Identifying the Tabs
Quotation Paths
Negotiation Paths
๐ Each tab configures a specific step of the negotiation.
4.1: Selecting the Quotation Tab
Click on the "Quotation Paths" tab.
Click Add Paths.
4.2: Viewing the Template
The template will display the default provider "Bloquo".
Visible fields:
Priority
Spread
Weekend / Holiday
Buy/Sell tags
Type (Quotation or Negotiation)
4.3: Identifying the Tags
๐ต Blue Tag = Quotation
๐ฃ Purple Tag = Trade
๐ Tags help visually distinguish between path types.
5.1: Configuring Priority
Field: Priority
Define the order:
1 = highest priority
2, 3, 4... = descending priority
๐ The system always uses the lowest number first.
5.2: Defining the Spread
Field: Spread
Indicates the fee charged to the client.
Example: **0.01 = 1
๐ This is your revenue per operation.
5.3: Configuring Operational Limits
Field: Minimum Value
Must be equal to or higher than the pair's minimum value.
โ Common error: value lower than allowed.
Field: Maximum Value
Must be equal to or lower than the pair's maximum.
Example: If the pair max is R$1000 โ path max must be โค R$1000.
5.4: Defining Operating Hours
Field: Start Time (HH:MM)
Field: End Time (HH:MM)
5.5: Configuring Special Days
Checkbox: Weekend โ enable Saturday/Sunday operations
Checkbox: Holiday โ enable holiday operations
โ
Ensures flexibility for continuous service.
5.6: Provider Confirmation
Field: Provider
Should display "Bloquo" by default.
6.1: Saving the Configuration
Review all details.
Click Save.
6.2: Creation Confirmation
The path will appear in the Quotation Paths list.
Confirm the settings.
7.1: Tab Change
Switch to the Negotiation Paths tab.
Click Add Paths.
๐ The flow is the same as the quotation process.
7.2: Form Completion
Fields: Priority, Spread, Limits, Schedules, etc.
The rules remain the same.
๐ ๏ธ Main difference: these paths are used for actual trade execution.
7.3: Negotiation Saving
Click Save
The negotiation path will appear in the list.
8.1: Return to Main Screen
Go back to the main paths interface.
View the cards of created paths.
8.2: Card Structure
Each card contains:
Provider: Bloquo
Priority
Spread
Max Value
Enablement (weekend/holiday)
Tags: Buy, Sell, or Both
Type: Quotation or Negotiation
8.3: Editing Options
Click the โ๏ธ pencil icon to edit.
Adjust values when necessary.
9.1: Final Verification
Ensure both paths are created:
โ Quotation Path
โ Negotiation Path
Check details and logic across configurations.
9.2: Enabling for Operation
The client is now enabled to operate
The settings are active and ready for use
๐ Congratulations! The client is ready to trade with fully configured paths.